The Index/№ 05
ADU / Garage ConversionsPlate · ADU / Garage Conversions

The Account № 05 · Tomorrowland Remodeling

ADU / Garage Conversions

Add a separate living space on your property — perfect for in-laws, adult kids, or rental income.

Pricing
Lump-sum, itemized
Crew
In-house staff
Service area
Greater Houston
Warranty
Workmanship-backed

Section A

Scope of Work

Everything written into the contract before the first nail. Lines are itemized, not bundled.

  • / 01Garage conversions into studios or 1-bed units
  • / 02Detached backyard cottages and granny flats
  • / 03Apartments built above existing garages
  • / 04Permits, utilities, and engineering coordinated

Section B

Build Tracks

Three lanes most adu / garage conversions jobs fall into. Pick a lane on the walk-through; the budget follows.

01Track A

Attached garage conversion

Insulate, finish, add a bath and kitchenette — ~400 sq ft of new living space.

02Track B

Garage apartment (above)

Add a second story over the existing garage for a true 1-bed unit with separate entry.

03Track C

Detached backyard ADU

Stand-alone 400–1,200 sq ft cottage with its own utilities, address, and rental potential.

04Track D

Pool house / casita

Conditioned guest suite with a bath, kitchenette, and covered porch tied into existing pool area.

Section C

Materials & Method

ADU / Garage Conversions material detail 1ADU / Garage Conversions material detail 2

ADUs live or die on sound separation, thermal envelope, and a properly sized HVAC system. We frame demising walls with staggered studs and Roxul mineral wool, spray-foam the envelope to R-21 walls / R-38 ceiling, and right-size mini-split heat pumps for the load. Separate sub-panels and dedicated water-heater circuits make future rental conversion seamless.

Section D

House Standards

/ 01

City of Houston permit experience — we know the ADU code paths

/ 02

Separate utility metering options handled with CenterPoint

/ 03

Foundation, framing, plumbing, electrical, finishes — one team

/ 04

Designed to appraise as added square footage, not a shed

Section E

From the Project Book

Open the full gallery
ADU / Garage Conversions project 1
Plate 01
ADU / Garage Conversions project 2
Plate 02
ADU / Garage Conversions project 3
Plate 03

The First Step ◆ Free Walk-Through

Bring us the house you have.

Walk-throughs are on the house. We hand back measured drawings, a locked-in budget and a start date — a written quote within 48 hours, before a single demo bag opens.